Clean Rooms Australia Logo Clean Rooms Australia Retina Logo Clean Rooms Australia Mobile Logo Clean Rooms Australia Mobile Retina Logo Clean Rooms Australia Sticky Logo Clean Rooms Australia Sticky Logo Retina
  • Home
  • 40 years in business
  • Projects
  • Pass through hatches
    • Standard
    • Bleedthrough
    • Hepa filtered
    • X20 radiation
    • Cytotoxic
  • Cleanrooms
    • Hardwall cleanrooms
    • Softwall cleanrooms
    • Modular cleanrooms
    • Mobile and portable cleanroom
    • Containment facilities
  • Cleanroom services
    • Commissioning and qualification
    • Components and products
    • Construction and installation
    • Design and consulting
    • Existing facility modification
    • Project management
    • Maintenance
    • Validation
  • Cleanrooms equipment
    • Cleanroom air showers
    • Cleanroom workbenches
    • Laboratory trolleys
    • Step over benches
    • Pass through hatches
  • Contact
  • Blog
  • +612 9939 1040

+612 9939 1040

Call Us Today! 1.555.555.555
info@yourdomain.com

Insert Tagline Here

+612 9939 1040

Home  /  Validation
Loading...
  • Validation

Validation admin 2017-09-21T17:08:17+10:00

Validation

At Cleanrooms Australia, we offer integrated cleanroom design and construction, therefore we take responsibility for delivering the facility that was promised to our client. This comes in the form of an At Rest Validation Report. This report is provided by an unbiased third party on the performance of all our cleanrooms.
Cleanroom Validation

Cleanroom Validation

Depending on the cleanroom standard you are constructing your facility to, cleanroom validation may be as simple as proving the performance of your cleanroom in operational state.

Cleanroom validation can also refer to a VMP(validation master plan). A validation master plan is a document referred to by the GMP(which is the ‘Good Manufacturing Practice’ recommended by the Pharmaceutical Inspection Convention and Pharmaceutical Inspection Co-operation Scheme – jointly referred to as PIC/S), and used in the pharmaceutical industry.

A cleanroom validation master plan is how your entire operation performs including:

  • personnel flow,
  • product flow,
  • material flow,
  • waste flow,
  • calibration,
  • maintenance,
  • training, etc.

There are three states to an operating cleanroom:

  • as built
  • at rest
  • in operation

Third-party Cleanroom Validating Services

When providing validation certification we always use NATA certified inspectors to provide NATA traceable reports.

NATA is the authority that provides independent assurance of technical competence through a proven network of best practice industry experts provided for customers who require confidence in the delivery of their products and services. NATA provides assessment, accreditation and training services to laboratories and technical facilities throughout Australia and internationally.

Browse

  • Home
  • 40 years in business
  • Projects
  • Pass Through Hatches
  • Cleanrooms
  • Cleanroom Services
  • Cleanrooms equipment
  • Blog

Pass through hatches

  • Standard
  • Bleedthrough
  • Hepa Filtered
  • X20 Radiation
  • Cytotoxic

Cleanroom equipment

  • Pass Through Hatches
  • laboratory Trolleys
  • Cleanroom Air Showers
  • lighting
  • Cleanroom Workbenches
  • Step Over Benches

Cleanroom Services

  • Design And Consulting
  • Commissioning And Qualification
  • Components And Products
  • Construction And installation
  • Existing Facility Modification
  • Maintenance
  • Project Management
  • Validation

Contact

Tel: +61 2 9939 1040
Fax: +61 2 9938 3724

Mailing List

Join our mailing list for latset news and events

Our privacy policy

Cleanrooms

  • Cleanrooms
  • Containment Facilities
  • Hardwall Cleanrooms
  • Mobile And Portable Cleanroom
  • Modular Cleanrooms
  • Softwall Cleanrooms
Copyright © Cleanrooms Australia 2017
All rights reserved
FacebookTwitterYouTubeLinkedin